USPS Everett, WA SDC
USPS Everett, WA SDC
USPS Everett, WA P&DF / North DDC - SDC Phase 1Project Manager: Nick Hilger
DOCUMENTS ADDED 12/06/2023 as follows:
DOCUMENTS ADDED 10/27/2023 as follows:
Additional Asbestos Reports
SITE PHOTOS EXTERIOR CANOPY & RAMP 06/07/2023
PREBID SITE PHOTOS from 06/20/2023
*ADDENDUM No. 01
ADDITIONAL PROJECT DOCUMENTS
Original Bid Drawings (dated 06/02/2023)
*Note: Refer to Addenda No. 01 for Full Construction Drawing Set